Obsolete PLCs and operator panels keep running until the day they don’t, and then spare parts, programming software and the people who knew the code are hard to find. PCA migrates legacy controls to current platforms carefully: we document what you have first, plan the cutover around production, and test before we touch the floor.
Migrations we have done
- SLC 500 to ControlLogix and CompactLogix. Including a sheller where we replaced the SLC processor with a CompactLogix and kept the existing I/O rack in service as remote I/O.
- PLC-5 to ControlLogix on food and dairy process lines.
- Mitsubishi to Siemens S7-1200 on a nursery soil mixing line.
- DirectLOGIC to Allen-Bradley or Productivity. A septage receiving station moved to Allen-Bradley; a water treatment plant’s two DirectLOGIC PLCs replaced with one Productivity3000.
- CLICK to CompactLogix for a treatment system builder, with CLICK PLUS units kept as remote I/O and a familiar HMI kept for operators.
- PanelView and PanelMate to C-more touchscreens, and an obsolete skid operator panel replaced with Ignition.
- LookoutDirect and legacy InTouch to current SCADA, including Wonderware to Ignition at a water treatment plant, and SCADA upgrades that keep your recipe, batch and scale data.
How we approach a migration
Document before changing
When code is undocumented or the original builder is gone, we read the existing program, document the sequences and I/O, and redraw P&IDs and wiring where needed. We have written descriptions of operation from existing programs and produced address maps and annotated listings for OEM controllers the plant never had documentation for. Sometimes the right answer is to keep a working controller and integrate it rather than replace it.
Phased cutovers
Production rarely stops for long. We plan changes around shutdowns and seasons: rolling tested code out one machine at a time, keeping existing I/O in service as remote I/O, handing circuits from an old processor to a new one with handshaking, or modernizing a plant over several harvests.
Test before startup
Where the process allows it, we test new programs in simulation or emulation before startup, then field-verify signals during checkout.
Platforms we work with
Allen-Bradley ControlLogix, CompactLogix, SLC 500, PLC-5 and MicroLogix; AutomationDirect Productivity, Do-more/BRX, CLICK and DirectLOGIC; Siemens S7-1200 and STEP 7; Schneider Modicon; GE Series 90-30; Ignition, Wonderware InTouch, GE iFIX, FactoryTalk View, PanelView, C-more and Red Lion.
Related projects
- Shelling plant modernization, season by season: SLC 500 to CompactLogix with the old I/O rack kept as remote I/O.
- Water treatment plant PLC and Ignition SCADA: two DirectLOGIC PLCs and Wonderware replaced with a Productivity3000 and Ignition.
- Stormwater treatment system control panels: a CLICK program rewritten on CompactLogix while operators kept a familiar HMI.
- Wine filtration skid controls and CIP rebuild: a new codebase on the skid’s existing PLC and a new Ignition HMI.
- Flash cooler utilities panel with Siemens integration: an undocumented OEM Siemens program documented and integrated, not replaced.
- Stand-alone CIP system for a whey plant: circuits handed off from a legacy PLC-5, tested in emulation first.
Related industries
We do this work in these industries:
- Food and beverage
- Dairy
- Water and wastewater
- Nut hulling, shelling and processing
- Wine and spirits
- Manufacturing and heavy industry
Have a project like this? Send us your drawings, motor list or a short description through the quote request form, or contact us to talk it through with an engineer.