Project · Mission-critical facilities
Data Center Generator Fuel-Oil Controls
Industry: A Southern California data center (delivered as controls subcontractor to a mechanical contractor)
The challenge
The facility’s emergency generators needed a fuel-oil delivery system that would keep running through a controller or power-supply failure and report everything to the building management system (BMS).
What we did
- Designed, built and programmed a main tank control panel with two mirrored AutomationDirect DL06 PLCs that fail over automatically, dual UPS-fed power sources, redundant 24 VDC supplies, a C-more touchscreen, an E-stop, HOA switches and alarm history.
- Built five day-tank control panels, one per generator, each with its own PLC and touchscreen controlling the return pump and the supply and return valves, with a pump test function.
- Programmed alternating lead/lag supply pumps with automatic failover, day-tank fill and return logic, and leak and low-level interlocks from the tank monitoring and fuel filtration systems, with all PLCs sharing data with the BMS over Modbus/TCP.
- Built a separate dual-PLC make-up water control panel with tank level, pressure monitoring, pump speed control and Modbus data for the BMS.
- Delivered the O&M manual, drawings and submittals, and returned on site for service.
The result
The data center’s generator fuel and make-up water systems run on redundant controls that are fully visible in the BMS.
Platforms and equipment
AutomationDirect DirectLOGIC DL06, C-more, Modbus/TCP
Related
Have a similar project?
Tell us what you are working on through the quote request form or the contact page. We design, build, program and start up control systems for plants across California.
Have a panel or project in mind?
Answer a few quick questions and a PCA engineer will get back to you within one business day.